EPC PROJECTS
DIVERSE PORTFOLIO OF ESS DEPLOYMENTS AND PROJECT EXECUTION
TPE ENERGY
Power: 2MW
Energy: 3.15 MWh
Use Case: Automatic Frequency Control (AFC)
Grid Connection Date: Q2 2021
Status / Location: In Service/ Zhongli, Taiwan
IN-HOUSE ESS PROJECT
Power: 1MW
Energy: 1.3 MWh
Use Case: Demo Site
Grid Connection
Date: Q4 2022
Status / Location: In Service / Luzhu, Taiwan
ATE ENERGY
Power: 2MW
Energy: 2.6 MWh
Use Case: Automatic Frequency Control (AFC)
Grid Connection Date: Q3 2023
Status / Location: In Construction/ Chiayi, Taiwan
HUA GUO ENERGY
Power: 3MW
Energy: 3.9 MWh
Use Case: Automatic Frequency Control (AFC)
Grid Connection Date: Q3 2023
Status / Location: In Construction/ Chiayi, Taiwan
BEI-JIE ENERGY
Power: 1.9 MW
Energy: 2.3 MWh
Use Case: Automatic Frequency Control (AFC)
Grid Connection Date: Q1 2024
Status / Location: In Construction/ Taitung, Taiwan
BEI-JIE ENERGY
Power: 1.9 MW
Energy: 2.3 MWh
Use Case: Automatic Frequency Control (AFC)
Grid Connection Date: Q1 2024
Status / Location: In Construction/ Taitung, Taiwan
SUPER POWER
Power: 3.6MW
Energy: 4.6 MWh
Use Case: Automatic Frequency Control (AFC)
Grid Connection Date: Q4 2023
Status / Location: In Construction/ Penghu, Taiwan